Swissport

INDUSTRY: Transportation

REGION: Europe

 

Challenges

To automate airport staff scheduling that meets operational needs, responds to ad hoc requests, and dispatches appropriate skills in real-time.

Outcomes

Swissport was able to develop an automatic scheduling tool that cut planning time in half, can meet 95-100% of employee scheduling preferences, and save approximately $1M per year.
1 MM
Cost Savings for Airport Operations
1 %
Employee Scheduling Preferences Met

Providing best-in-class airport ground services

Keeping airplanes in the air takes a full crew on the ground, too. Swissport International Ltd. has a team of 43,000 employees that provide airport ground services and cargo handling for 850 aviation customers across 274 airports in 44 countries.

 

What they needed

Airport ground handling includes a broad range of passenger and ramp services, all of which can be a challenge to run smoothly. At Zurich airport alone, Swissport employs 2,000 people who do check-in and gate tasks, baggage management, aircraft loading, push-back movements, and much more. And all these people have different work skills, contract types, and shift duties. So, putting together a work schedule for even a single month is complex. It comprises the following key steps:

  • Generate tasks and build a master schedule of shifts
  • Assign daily shifts to employees and generate monthly shift schedules according to operational constraints, labor regulations, and individual preferences
  • Handle ad-hoc requests for schedule changes, such as when someone is sick
  • Dispatch teams in real-time, when and where their skills are needed

Before, the Swissport planning teams created schedules manually, sometimes spending weeks sketching out a plan for the coming month. And it was an ongoing challenge to coordinate continually changing labor requirements with individual work contracts and duty preferences. They started looking for a better solution, but none of the available commercial software for staff scheduling could meet their needs.

So, they set out to build their own.

 

Solving their scheduling complexities

Swissport teamed up with a research team at nearby Zurich University of Applied Sciences ZHAW. Their goal? Develop scheduling software that is powerful enough to handle Swissport’s complex operational planning puzzles. The tool also needed to be general and flexible enough for industries beyond aviation.

They called it Auto-Roster. Unlike most commercial rostering tools, Auto-Roster uses Mixed Integer Linear Programming (MIP), combined with other optimization techniques, including decomposition and relaxation, pre-and post-processing, and a variety of heuristic procedures.

At first, it wasn’t clear that Auto-Roster could make it off the ground. Its optimization engine has over 60,000 lines of code, with more than 1 million integer variables and 500,000 constraints. With so many things to account for, one of the biggest challenges was to solve the problems in a reasonable time—because MIP models are often too slow to be useful.

“Approaching large-scale, real-world rostering problems with MIP techniques is innovative and challenging, since computation times are typically far beyond any acceptable limits,” said Prof. Andreas Klinkert, Technical Project Leader at ZHAW. “Several times, the project was close to failing due to intractable MIP models.”

During the project, the research team had several mathematical breakthroughs and was finally able to establish computationally tractable MIP model formulations. They also brought in Gurobi Optimization to help speed things up even more. With the Gurobi Optimizer, the Auto-Roster team can now run complex models with millions of variables—all within 20-70 hours.

“For a long time, Gurobi was by far the only MIP solver that could solve our models in a reasonable time, and we suspect that this is still the case now,” said Dr. Peter Fusek, Lead Mathematical Modeling at ZHAW.

 

Saving significant time

Now, Swissport is using Auto-Roster to plan work schedules across all three international airports in Switzerland—Zurich, Geneva, and Basel—with more rollouts in progress at other airports in Europe.

Already, it’s making a big difference. The Swissport planning team takes about half the time to set shift schedules. They can plan more efficient shifts, with less wasted time and a better match between supply and demand. Their rosters are also more robust, fair, and—above all— flexible. Employees are happy that their scheduling preferences are fulfilled 95-100% of the time.

All told, better planning is saving Swissport more than $1 million a year.

Guidance for Your Journey

30 Day Free Trial for Commercial Users

Start solving your most complex challenges, with the world's fastest, most feature-rich solver.

Always Free for Academics

We make it easy for students, faculty, and researchers to work with mathematical optimization.

Try Gurobi for Free

Choose the evaluation license that fits you best, and start working with our Expert Team for technical guidance and support.

Evaluation License
Get a free, full-featured license of the Gurobi Optimizer to experience the performance, support, benchmarking and tuning services we provide as part of our product offering.
Academic License
Gurobi supports the teaching and use of optimization within academic institutions. We offer free, full-featured copies of Gurobi for use in class, and for research.
Cloud Trial

Request free trial hours, so you can see how quickly and easily a model can be solved on the cloud.

Search