Facility.java


/* Copyright 2020, Gurobi Optimization, LLC */

/* Facility location: a company currently ships its product from 5 plants
   to 4 warehouses. It is considering closing some plants to reduce
   costs. What plant(s) should the company close, in order to minimize
   transportation and fixed costs?

   Based on an example from Frontline Systems:
   http://www.solver.com/disfacility.htm
   Used with permission.
 */

import gurobi.*;

public class Facility {

  public static void main(String[] args) {
    try {

      // Warehouse demand in thousands of units
      double Demand[] = new double[] { 15, 18, 14, 20 };

      // Plant capacity in thousands of units
      double Capacity[] = new double[] { 20, 22, 17, 19, 18 };

      // Fixed costs for each plant
      double FixedCosts[] =
          new double[] { 12000, 15000, 17000, 13000, 16000 };

      // Transportation costs per thousand units
      double TransCosts[][] =
          new double[][] { { 4000, 2000, 3000, 2500, 4500 },
              { 2500, 2600, 3400, 3000, 4000 },
              { 1200, 1800, 2600, 4100, 3000 },
              { 2200, 2600, 3100, 3700, 3200 } };

      // Number of plants and warehouses
      int nPlants = Capacity.length;
      int nWarehouses = Demand.length;

      // Model
      GRBEnv env = new GRBEnv();
      GRBModel model = new GRBModel(env);
      model.set(GRB.StringAttr.ModelName, "facility");

      // Plant open decision variables: open[p] == 1 if plant p is open.
      GRBVar[] open = new GRBVar[nPlants];
      for (int p = 0; p < nPlants; ++p) {
        open[p] = model.addVar(0, 1, FixedCosts[p], GRB.BINARY, "Open" + p);
      }

      // Transportation decision variables: how much to transport from
      // a plant p to a warehouse w
      GRBVar[][] transport = new GRBVar[nWarehouses][nPlants];
      for (int w = 0; w < nWarehouses; ++w) {
        for (int p = 0; p < nPlants; ++p) {
          transport[w][p] =
              model.addVar(0, GRB.INFINITY, TransCosts[w][p], GRB.CONTINUOUS,
                           "Trans" + p + "." + w);
        }
      }

      // The objective is to minimize the total fixed and variable costs
      model.set(GRB.IntAttr.ModelSense, GRB.MINIMIZE);

      // Production constraints
      // Note that the right-hand limit sets the production to zero if
      // the plant is closed
      for (int p = 0; p < nPlants; ++p) {
        GRBLinExpr ptot = new GRBLinExpr();
        for (int w = 0; w < nWarehouses; ++w) {
          ptot.addTerm(1.0, transport[w][p]);
        }
        GRBLinExpr limit = new GRBLinExpr();
        limit.addTerm(Capacity[p], open[p]);
        model.addConstr(ptot, GRB.LESS_EQUAL, limit, "Capacity" + p);
      }

      // Demand constraints
      for (int w = 0; w < nWarehouses; ++w) {
        GRBLinExpr dtot = new GRBLinExpr();
        for (int p = 0; p < nPlants; ++p) {
          dtot.addTerm(1.0, transport[w][p]);
        }
        model.addConstr(dtot, GRB.EQUAL, Demand[w], "Demand" + w);
      }

      // Guess at the starting point: close the plant with the highest
      // fixed costs; open all others

      // First, open all plants
      for (int p = 0; p < nPlants; ++p) {
        open[p].set(GRB.DoubleAttr.Start, 1.0);
      }

      // Now close the plant with the highest fixed cost
      System.out.println("Initial guess:");
      double maxFixed = -GRB.INFINITY;
      for (int p = 0; p < nPlants; ++p) {
        if (FixedCosts[p] > maxFixed) {
          maxFixed = FixedCosts[p];
        }
      }
      for (int p = 0; p < nPlants; ++p) {
        if (FixedCosts[p] == maxFixed) {
          open[p].set(GRB.DoubleAttr.Start, 0.0);
          System.out.println("Closing plant " + p + "\n");
          break;
        }
      }

      // Use barrier to solve root relaxation
      model.set(GRB.IntParam.Method, GRB.METHOD_BARRIER);

      // Solve
      model.optimize();

      // Print solution
      System.out.println("\nTOTAL COSTS: " + model.get(GRB.DoubleAttr.ObjVal));
      System.out.println("SOLUTION:");
      for (int p = 0; p < nPlants; ++p) {
        if (open[p].get(GRB.DoubleAttr.X) > 0.99) {
          System.out.println("Plant " + p + " open:");
          for (int w = 0; w < nWarehouses; ++w) {
            if (transport[w][p].get(GRB.DoubleAttr.X) > 0.0001) {
              System.out.println("  Transport " +
                  transport[w][p].get(GRB.DoubleAttr.X) +
                  " units to warehouse " + w);
            }
          }
        } else {
          System.out.println("Plant " + p + " closed!");
        }
      }

      // Dispose of model and environment
      model.dispose();
      env.dispose();

    } catch (GRBException e) {
      System.out.println("Error code: " + e.getErrorCode() + ". " +
          e.getMessage());
    }
  }
}

Try Gurobi for Free

Choose the evaluation license that fits you best, and start working with our Expert Team for technical guidance and support.

Evaluation License
Get a free, full-featured license of the Gurobi Optimizer to experience the performance, support, benchmarking and tuning services we provide as part of our product offering.
Academic License
Gurobi supports the teaching and use of optimization within academic institutions. We offer free, full-featured copies of Gurobi for use in class, and for research.
Cloud Trial

Request free trial hours, so you can see how quickly and easily a model can be solved on the cloud.

Search